Pumping cement plugs casing pressure

This well involved pumping cement plugs to act as wellbore barriers to address sustained casing pressure. The first two plugs were pumped using a special Spray valve assembly. This was followed by a final plug inside casing to isolate perforations above the zones which were milled and cemented with the Spray valve assembly. All jobs were completed successfully with the first two plugs being pressure tested and inflow tested successfully. The final plug was tagged. All objectives were achieved.